Policies
and Warranty Statement
Installation
Replace the flywheel seal - no sense risking it!
Blockoff Sheet metal made in house.
Flywheel is installed along with clutch disk.
RSR CLutch Pack with modified starter ring gear
Passenger Sheet Metal Extensions
Sheet metal Blockoff
Sheet Metal Extension
Now with paint
This seals the engine compartment
Ready to install
Throttle cable assembly
Bill Howard wires the connections then solders everything,
The components mounted properly. The igniter
is actually mounted with copper wire to keep it off the floor and get some
good airflow to the heat sink.