Above you can see the waterproofing stuff (pink) over the polymer barrier ( tar).











Backfilling Friday 11/6/09.  Framers showed up first thing Monday.








THis was done by about 10am..  Next I set about marking all the I-joists.  There are 4700 feet of them, a total of 163 to be cut into 216 different peices in the final tally.  You can only buy then in 2' increments so odd lengths are combined to minimize waste.  Each joist was lettered A though N


Combos

Combos


Combos Sorted





















Quan Length Feet
A 7 41 287 7 41 287
A 7 7 41 287
7 41 287
B 25 40 1000 25 40 1000
B 25 25 40 1000
32 40 1280
C 45 26 1170 45 26 1170
H 14 7 40 280
12 36 432
D 19 24 456 19 24 456
G 22 11 36 396
1 34 34
E 34 22 748 34 22 748
L 7 1 36 36
1 30 30
F 5 12 60



K 10 1 34 34
51 26 1326

5 8 40 5 20 100
M 5 1 30 30
20 24 480
G 11 21 231



C 45 45 26 1170
34 22 748

11 15 165 11 36 396
I 10 5 26 130
5 20 100
H 7 25 175



J 4 1 26 26
     

7 15 105 7 40 280
D 19 19 24 456
    4717
I 5 15 75



N 4 1 24 24




5 11 55 5 26 130
E 34 34 22 748
163

J 4 6.5 26 1 26 26
F 10 5 20 100



K 9 3 27












  1 6.5 6.5 1 34 34

216

4717



L 2 8 16













5 4 20 1 36 36









M 5 6 30 1 30 30









N 4 6 24 1 24 24










216





















Noon Tuesday, 11/10/09























































































Dyno Shelf